Document Controller - Data Center Construction Job at Manpower Engineering, Phoenix, AZ

  • Manpower Engineering
  • Phoenix, AZ

Job Description

Our client, a leading global technology company supporting mission-critical data center construction projects, is seeking a Document Controller to join their team. As a Document Controller, you will be part of the Construction Project Team supporting Construction Managers, Project Engineers, General Contractors, subcontractors, design consultants, commissioning teams, vendors, and Operations. The ideal candidate will have strong attention to detail, excellent organizational skills, and strong written and verbal communication skills which will align successfully in the organization.

Job Title: Document Controller - Data Center Construction
Location: Phoenix, AZ
Pay Range: $64.71 - $69.71/hour

What's the Job?

  • Maintain organized and traceable project records, including drawings, submittals, RFIs, reports, permits, closeout records, and turnover documentation throughout the construction lifecycle.
  • Administer and track technical submittals, shop drawings, product data, samples, RFIs, revisions, approvals, and outstanding actions.
  • Develop and maintain turnover and closeout documentation trackers while identifying documentation gaps and turnover risks.
  • Review, validate, and manage O&M manuals, as-built drawings, commissioning records, warranties, training records, and other turnover-critical documentation.
  • Perform quality-control reviews to ensure documentation is complete, accurate, properly classified, audit-ready, and compliant with project requirements.


What's Needed?

  • 5+ years of experience in Construction Document Control and Electronic Document Management Systems such as Procore, ProjectSight, SharePoint, or Common Data Environments (CDEs).
  • 3+ years of experience managing turnover packages, O&M manuals, as-built drawings, commissioning records, warranties, training documentation, and closeout deliverables.
  • 3+ years of experience working with construction drawings, specifications, RFIs, submittals, change orders, document registers, and project trackers.
  • Strong Excel and document tracking capabilities with experience using Microsoft Excel, Word, Outlook, Teams, and PowerPoint.
  • Ability to interpret construction specifications, coordinate across multiple stakeholders, identify documentation gaps, and maintain revision/version control.


What's in it for me?

  • Support the delivery of large-scale, mission-critical data center projects for a leading global technology client.
  • Gain exposure to the full project lifecycle, including design, construction, commissioning, closeout, and operations transition.
  • Work closely with Construction Managers, Project Engineers, Commissioning Teams, Contractors, Designers, Vendors, and Operations.
  • Develop expertise in industry-leading document management systems, Common Data Environments (CDEs), and turnover processes.
  • Contribute directly to project success by improving turnover readiness and supporting successful operational handover.

 

If this is a role that interests you and you’d like to learn more, click apply now and a recruiter will be in touch with you to discuss this great opportunity. We look forward to speaking with you!

 

About ManpowerGroup, Parent Company of: Manpower, Experis and Talent Solutions

Experis® is a global leader in technology services and part of the ManpowerGroup® (NYSE: MAN) family of brands. We connect skilled technology professionals with meaningful opportunities where they can grow their careers, expand their expertise and make a real impact. Guided by the belief that it takes Human Ingenuity to unlock the true potential of technology, Experis helps people gain experience with leading organizations, build sought-after skills and take the next step toward a brighter future. Backed by ManpowerGroup's 75+ years of workforce expertise and global reach across more than 70 countries and territories, Experis brings the scale, insight and opportunity to help people and businesses thrive. ManpowerGroup is consistently recognized for its commitment to inclusion, ethics and responsible business, including being named one of the World's Most Ethical Companies. Learn more at Experis.com.

Job Tags

Temporary work, For contractors, For subcontractor

Similar Jobs

Community Medical Centers

Inventory Control Coordinator Job at Community Medical Centers

 ...highest level of care is through taking care of our incredible teams. Learn more on our Benefits page. ResponsibilitiesThe Inventory Control Coordinator is responsible for managing assigned inventories through daily, weekly, monthly, and annual physical counts,... 

Top Tempo Technical

Field Service Technician - Boston, MA Metro Area Job at Top Tempo Technical

 ...Field Service Technicians - Boston, MA M etro A rea Technicians with excellent skills and customer service needed with the ability to provide strong electrical and mechanical diagnostics, troubleshooting, maintenance, and repair skills. Responsibilities:... 

Peloton Cycle

Sr. Learning Experience Designer, Global LXD Studio Job at Peloton Cycle

ABOUT THE ROLEAt Peloton, we empower people to live fit, strong, long, and happy lives and the Learning and Development team plays a pivotal role in bringing this mission to life internally. By creating learning experiences that help team members grow stronger in their... 

Over The Moon Heating, Air & Electric

Electrical Lead Installer - Up to $50 Hourly! Job at Over The Moon Heating, Air & Electric

 ...Job Description Job Description Over The Moon Hiring Lead Electrical Installer Tired of running installs for shops that cut corners? Ready to lead jobs you'd be proud to put your name on? Looking for a role that respects your card and your craft? Excited... 

CookUnity

Food Safety Supervisor Job at CookUnity

 ...Food Safety SupervisorField Operations New York, New York, United StatesAbout CookUnity:Food has lost its soul to modern convenience. And with it, it has lost the power to nourish, inspire, and connect us. So in 2018, CookUnity was founded as the first-of-its-kind platform...